Hampton case study

Recent Topics

The Air Conditioning and water heater systems selected are among the most energy efficient available on the market. Cleaning solutions are bio-degradable.

Throughout the construction, Firmo Construction maintained a rigorous recycling program of all materials and implemented a system of barriers around the construction area to reduce soil erosion and waterway sediment.

The site was developed to increase the open spaces beyond the zoning guidelines, thereby minimizing the footprint. The building design was run through a vigorous energy modeling program under the watchful eye of an MEP engineer.

The building position on the site maximizes the resources of Hampton case study Florida sunshine for lighting and solar power, while limiting the impact on cooling costs.

Solutions After an initial bidding process the owners selected American Contracting to work with them to develop a final plan that incorporated their design ideas to work within their budget. Even our guests can get involved participating in our in-room recycling and linen re-use programs.

One of the owners, a principal at a leading commercial architecture firm in the area, created her own construction drawings for the renovation.

Hampton Inn - Sarasota, Florida

Zero CFC Air conditioner refrigerant Smart sensors Glazing is utilized on the exterior surface of the building that transmits visible light, but rejects the hot Florida sun. What exactly does this mean? Through the process the owners became confident that American could not only do the work, but could also be trusted to complete the job while the owners were on a long planned month long vacation in Australia and New Zealand.

Planning included a kitchen design by Canton Kitchens, a lighting plan for the space and design elements for the exterior of the house, including a new custom made front door. Solar Thermal System Savings: An extensive recycling program has been implemented and the use of recycled products is encouraged.

The Solar package included project engineering, installation, and funding. The site required minimal additional infrastructure for waste, water and traffic patterns. The system is anticipated to generate up to 1.

This high local material percentage reduces the impact of transportation on the environment, Hampton case study also maintaining the local economy. Zero CFC based refrigerants will be used which minimizes the impact on the ozone depletion. From the beginning, our brochures and sales collateral have all been printed on recyclable paper.

Storm water system Building position maximizes solar energy lighting resources while limiting impact on cooling costs Outside structures allow for perfect natural lighting The storm water system is designed to store, filter and clean the water on site before being released into the waterways.

Using motion detection and door switch sensors, the system resets the thermostat settings when the room is unoccupied. Employees are encouraged to use public transportation to get to work. Special parking spaces are set aside in the parking lot for Fuel efficient and carpool vehicles.

A similar strategy was used for the rooftop, where reflective, Energy star rated material was installed to reduce the heat absorbed by the rooftop. In addition to the water savings from the irrigation system, Potable water usage will be reduced by a third by the use of water saving fixtures in the guest rooms and public areas.

Throughout the design was driven by the wish of the owners to reflect the look and feel of the homes and interiors of the Southwest of the United States. Each of the guest rooms is equipped with a individually controlled thermostat with smart sensor.Case Study The following is a case from our office records.

A 20 year old male presented to our practice with a 38 degree scoliosis. Secondary conditions present because of the structural changes: Neck pain, neck stiffness, shoulder pain, upper back pain, lower back pain, pain in the knee and trouble sleeping. The chiropractor performed an. Hampton Machine Tool Company, a machine tool manufacturer, was founded in Hampton's customer base is made up primarily of military aircraft manufactures and.

a case study of hampton machine tool company (hmtc) group 3 Company Background • Hampton Machine Company was established ina manufacturing company engaged in providing automobile tools and military aircraft.5/5(1).

CertainTeed High Performance Exterior Sheathing CASE STUDY: HAMPTON INN & SUITES Project: Glass-Reinforced Exterior Gypsum Sheathing Location: Towanda Avenue, Normal, Illinois, McLean County (in the heart of Central Illinois, miles southwest of Chicago). Hampton Case Study - Download as Word Doc .doc /.docx), PDF File .pdf), Text File .txt) or read online.

Hampton case study. Read this essay on Hampton Case Study. Come browse our large digital warehouse of free sample essays.

Get the knowledge you need in order to pass your classes and more. Only at killarney10mile.com".

Download
Hampton case study
Rated 3/5 based on 96 review